Quebec launching new office to accelerate creation of daycare spaces
With thousands of children on a waiting list for child care, Quebec is setting up a new government office to deal with the backlog.
More than 33,300 children were on a waiting list for a space as of Aug. 31.
In October 2021, Quebec launched a "Grand chantier pour les familles," which aimed to ensure a place for all children by 2024-2025. Projects have been submitted to the Ministry of the Family, but for various reasons, it can take a long time for the projects to materialize.
Quebec is therefore launching "Bureau d'accélération des projets" to speed up the process.
In an interview on Monday, Family Minister Suzanne Roy said the office will meet for the first time this month and then every two weeks.
"When a problem is reported, it will find out what is delaying or blocking the process, and then work to solve the problem. And his decisions will be binding," she said.
"In order for decisions to be made more quickly, to avoid back and forth, when there are difficulties, exceptions or special cases, it will be an office that will do an enforceable follow-up. It will make decisions and it will move," said Roy.
The minister wants to "avoid at all costs" projects that exceed the two-year deadline for completion. This often includes design and construction.
Currently, there are 700 projects underway. She could not say how many of these are actually stalled, as the number fluctuates and depends on various factors.
She noted that since the launch of the Grand chantier pour les familles in October 2021, more than 8,000 spaces have been created, "a 20-year high," she said. But the need is even greater -- hence the need to accelerate.
The Association québécoise des Centres de la petite enfance (AQCPE) was pleased with Minister Roy's initiative.
"It is to go faster, to unblock [the projects]. We had asked Mathieu Lacombe, the previous minister. So, that the minister puts it in place quickly at the beginning of his mandate, for us, it's very good news," said Hélène Gosselin, president of the board of directors of the AQCPE.
She gave examples of projects that can be delayed or blocked because of a problem with the size of the land, the notary or a change in the development adviser, which results in several "round trips" with government officials.
She hopes that when a solution is found for a particular project, it "can be used as a model" for other projects that face a similar problem.
This report by The Canadian Press was first published in French on Feb. 6, 2023.
CTVNews.ca Top Stories
From outer space? Sask. farmers baffled after discovering strange wreckage in field
A family of fifth generation farmers from Ituna, Sask. are trying to find answers after discovering several strange objects lying on their land.
Broadcaster and commentator Rex Murphy dead at 77: National Post
The National Post is reporting that Rex Murphy, the pundit and columnist who hosted a national call-in radio show for decades, has died.
Pearson gold heist suspect arrested after flying into Toronto from India
Another suspect is in custody in connection with the gold heist at Toronto Pearson International Airport last year, police say.
Millions of cyberattacks per hour as B.C. government investigates multiple breaches
Careful attention to government statements and legislation is required to get a handle on the level of risk British Columbians’ information is under, as investigators probe multiple breaches under a continued barrage of attacks.
Ontario family receives massive hospital bill as part of LTC law, refuses to pay
A southwestern Ontario woman has received an $8,400 bill from a hospital in Windsor, Ont., after she refused to put her mother in a nursing home she hated -- and she says she has no intention of paying it.
Debate on abortion rights erupts on Parliament Hill, Poilievre vows he won't legislate
A Conservative government led by Pierre Poilievre would not legislate on, nor use the notwithstanding clause, on abortion, his office says, as anti-abortion protesters gather on Parliament Hill.
Justin and Hailey Bieber are expecting their first child together
Hailey and Justin Bieber are going to be parents. The couple announced the news on Thursday on Instagram, both sharing a video that showcases Hailey Bieber's growing belly.
Here are the ultraprocessed foods you most need to avoid, according to a 30-year study
Studies have shown that ultraprocessed foods can have a detrimental impact on health. But 30 years of research show they don’t all have the same impact.
New 'Lord of the Rings' film coming in 2026
The Oscar-winning team behind the nearly US$6 billion blockbuster 'Lord of the Rings' and 'The Hobbit' trilogies is reuniting to produce two new films.