A new solution for the REM: Bypassing Sherbrooke East for 4.5 km, using railway land instead
A solution has been found to one of the holdout issues around Montreal's future rapid-transit line -- its route through the city's east end.
The REM was set to run along the main artery of Sherbrooke St., which both developers and local residents opposed.
But they had a counter-proposal that looks like it will work for 4.5 kilometres of the line. The new plan is to build it along the Souligny Railway route for that portion, running south of Sherbrooke before joining back up with the proposed route at the very eastern tip of the neighbourhood, at Georges-V Ave.
On Tuesday, the building corporation in charge of the line announced it made a deal with CN Rail on Dec. 30 and has secured an option to purchase a segment of this right-of-way.
This means the REM won't connect directly with the Honoré-Beaugrand station. But the new route will not only free up a commercial stretch of Sherbrooke St., it will also reach a new residential population, CDPQ Infra said.
"By bordering the Tétreaultville neighbourhood, the REM will be able to serve a substantial population pool lying farther away from the green line of the métro, reuse an existing railroad right-of-way, and incorporate the route into a broader transit corridor, thereby reducing impacts in this sector," CDPQ Infra said in a release.
"The neighbourhood is different, there’s a lot more room here, so that’s why we feel that the structure will feel less massive than if we were to install it on Sherbrooke -- definitely," the fund's vice-president, Christian Ducharme, told media.
The fund also says residents are happy with the idea.
"This corridor, because it's already a rail corridor, it's exploited -- they used to have a tramway here," said CDPQ Infra spokesperson Virginie Cousineau.
"So we think that some people see that that’s the real place to put a metro network here."
On Tuesday, some residents told CTV they didn't feel quite that way, and they think the line should be kept to the busier and more commercial areas.
"It’s going to be right in front of my door," said one local man, Ronald Daignault.
"It's not a good idea… it's unaesthetic, it's massive, it doesn’t belong in a neighbourhood where you live."
The line's new platform would be several metres high, similar to what's currently under construction in the west end of the ctiy.
Some are urging still more changes to the project, including at least one lawmaker who says it's already an eyesore.
"Anybody who goes on the road of the 40 can see this giant structure just beside it -- it's not very beautiful," said Quebec Solidaire MNA Alexandre Leduc.
The project's construction has already had its fair share of delays, from problems with location to soil issues, unexpected discoveries in the Mont-Royal Tunnel, and the pandemic.
All that has pushed the line's inauguration to fall 2022.
"We have to keep in mind that the REM is more than 300 workers, 30 work sites around Montreal," said REM spokesperson Jean-Vincent Lacroix.
"So of course the pandemic has an impact on activities."
Construction on the eastern section is still years away, and more meetings and consultations are in the works, with residents given another chance to voice their reactions to the new plans.
Whichever route is chosen, officials say residents in the east end will be able to get downtown in about 30 minutes on it.
CTVNews.ca Top Stories
Spectacular aurora light show to be seen across Canada Friday night
A rare and severe solar storm is expected to bring spectacular displays of the northern lights, also known as aurora borealis, across much of Canada and parts of the United States on Friday night.
Town of Fort Nelson, B.C., ordered to evacuate due to wildfire
The entire town of Fort Nelson, B.C., as well as the nearby Fort Nelson First Nation, has been ordered to evacuate due to an out-of-control wildfire.
Bouchard lifts Edmonton Oilers to 4-3 overtime win over Canucks in Game 2
Evan Bouchard scored 5:38 into overtime and the Edmonton Oilers bounced back for a 4-3 win over the Vancouver Canucks in the second round of the Stanley Cup playoffs on Friday.
McGill University seeks emergency injunction to dismantle pro-Palestinian encampment
McGill University has filed a request for an injunction to have the pro-Palestinian encampment removed from its campus.
Which Canadian cities have the highest and lowest grocery prices?
Where you live plays a big factor in what you pay at the grocery store. And while it's no secret the same item may have a different price depending on the store, city or province, we wanted to see just how big the differences are, and why.
Swarm of 20,000 bees gather around woman’s car west of Toronto
A swarm of roughly 20,000 bees gathered around a woman’s car in the parking lot of Burlington Centre.
Video shows naked raccoon catching B.C. family by surprise
When Marvin Henschel spotted a strange and hairless creature wandering through a front lawn in B.C.'s Lower Mainland, he could barely believe his eyes.
Barron Trump declines to serve as an RNC delegate
Former U.S. President Donald Trump's youngest son, Barron Trump, has declined to serve as a delegate at this summer’s Republican National Convention, according to a senior Trump campaign adviser and a statement from Melania Trump's office.
Out-of-control wildfire prompts evacuation alert for Fort McMurray, Saprae Creek Estates Friday night
An evacuation alert was issued for two Wood Buffalo communities Friday night, as crews battled an out-of-control wildfire near Fort McMurray.